NCQA does not prescribe the cost measures an organization selects, though it requires an organization to specify all aspects of its methodology (Element C). In addition, the organization must risk-adjust its measures (Element C, factor 8) and must meet the minimum statistical requirements for measurement error and measure reliability (PQ1 Element D, factor 2).
PHQ 2013